Prefabricated Rate Start

Light Steel frame
1 %

Factory produce the material of the house, build up on site

Work involved

1.On site work light gauge steel frame, fill with insulation material ,plumbing, house wrap, lock up gypsum borad

2.SIP (Sandwich Insulation Panel)

3. Steel frame+ Mgo borad

SPB panel system
1 %

Factory produce the blocks of the house, combine and fit up on site

Work involved

On site fit up wall panel, roof panel, floor panel which is made of the heavy steel frame, steel bar, bracing, cement board and light concrete, the panel embeded with plumbing and conduit and premier painted.

Modular
1 %

Factory produce and decorates the whole house, moves to the site

Work involved

On site fit up the house to foundation